2024 – 1 A duration driver is a A simple count of the number
Multiple Questions Answers – 2024
1. A duration driver is :
a. A simple count of the number of times an activity occurs.
b. An activity measures that is used for the life of an activity- based costing system.
c. An activity measures that is used for the life of company.
d. A measures of the amount of time required to perform an activity.
2. Spendlove corporation has provided the following data from its activity-based costing system
Activity cost pool |
Total cost |
Total activity |
|
Assembly |
$1,282,140 |
61,200 |
Machine- hours |
Processing orders |
$53,958.00 |
20,40 |
Orders |
Inspection |
$181,350 |
23,40 |
Inspection- hour |
The company makes 1,100 units of product S78N a year, requiring a total of 12,00 machine hours, 131 orders, and 31 inspection-hour per year. The product’s direct material cost is $50,89 per units and its direct labor cost is $20.56 per unit. The product sells of $113.30 per unit.
According to the activity-based costing system, the product margin for product S78N is : (Round your intermediate calculation to 2 decimal place).
a. $117,430.05
b. $46,035.00
c. $18,492.05
d. $15,027.55
3.Matt Company used activity- based costing. The company has two product. A and B. the annual production and sales of product A is 9,000 units and of product B is 6,500 units. There are three activity cost pool with total activity as follow:
|
|
Total Activity |
||
Activity Cost Pool |
Total Cost |
Product A |
Product B |
Total |
Activity 1 |
$36,260 |
250 |
350 |
700 |
Activity 2 |
$48,037 |
880 |
330 |
1,210 |
Activity 3 |
$120,450 |
850 |
3,530 |
4,380 |
The activity based costing cost per unit of product Ais closest to:
a. $14.33
b. $4.54
c. $7.84
d. $3.94
4. The controller Ferrence Company estimates the amount of material handing overhead cost that should be allocated to the company’s two product using the data that are given below:
|
Wall Mirrors |
Specialty Windows |
Total Expected Units Produced |
11,900 |
1,710 |
Total Expected Material Moves |
1,190 |
1,610 |
Expected Direct Labor- Hour Per Unit |
7 |
8 |
The total material handing cost for the year is expected to be $17,148.70.
If the material handing cost is allocated on the basis of direct labor- hours, how much of the total material handing cost would e allocated to the wall mirrors?
a. $9,566
b. $14,727
c. $12,894
d. $7,917