Create a work breakdown structure in MS Project using the existing information from Assignment 1 september 2023
MS Project Scheduling and Salvaging a Project
Create a work breakdown structure in MS Project using the existing information from Assignment 1. Note: This assignment will require you to submit a zipped file. Please see below for details on how to zip a file. Imagine your human resource project of revamping the employee compensation and benefits package is starting to develop issues. The project is eight (8) weeks off track and your team members are becoming discouraged. Several members of the team are consistently late with deadlines, and you have discovered that your budget depleted quicker than expected. Your project sponsor is looking for you to salvage this project. Write a six to eight (6-8) page paper in which you: Write a memo that communicates the budget situation to the rest of the team. Suggest three (3) ways to improve an underperforming team member. Organize a plan of action to get the project back on track. Develop a new critical path. Your assignment must: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required page length.
Online Assignment help for students and assignment writing services from Top Rated USA Experts at Affordable Prices. On-Time Delivery, 24/7 Chat Assistance.